The County shall work with the Ventura County Transportation Commission to analyze the feasibility of shared micromobility (e.g., bike sharing) vendors being required to provide storage/parking areas or facilities to be designated and/or physically placed outside of the public right-of-way if private shared mobility vendors are allowed to operate within the unincorporated areas of the county.
RMA
CTM-O Mobility-as-a-Service Enterprises – Parking
The County shall consider designating parking areas in County parking facilities for Mobility-as-a-Service (MaaS) vehicles to use between customer service runs and will work with cities to provide locations as well.
CTM-P Interim VMT CEQA Assessment Criteria
Following June 30, 2020 and prior to completion of Implementation Program CTM-B, all projects (not otherwise exempt from CEQA analysis) shall be evaluated for potential environmental impacts relative to VMT using the State’s minimum reduction standards, as follows:
Project Type | Measurement Unit | Model Trip Types | Minimum Criteria | Baseline VMT | Threshold VMT |
---|---|---|---|---|---|
Residential |
VMT/Capita |
Average of all Home Based Trip Types |
15% Reduction of Regional Average |
9.66 |
8.21 |
Office |
VMT/Employee |
Home Based Work Trips |
15% Reduction of Regional Average |
13.52 |
11.49 |
Industrial |
VMT/Employee |
Home Based Work Trips |
15% Reduction of Regional Average |
13.52 |
11.49 |
Retail |
Unincorporated VMT |
All Trip Types |
No Net Increase in Regional VMT |
7,500,249 |
7,500,249 |
Agriculture |
Unincorporated VMT |
All Trip Types |
No Net Increase in Regional VMT |
7,500,249 |
7,500,249 |
Infrastructure |
Unincorporated VMT |
All Trip Types |
No Net Increase in Regional VMT |
7,500,249 |
7,500,249 |
All Other Project Types |
Unincorporated VMT |
All Trip Types |
No Net Increase in Regional VMT |
7,500,249 |
7,500,249 |
If a proposed project is found to have a significant impact on VMT, the impact must be reduced, as feasible1, by modifying the project’s VMT to a level below the established thresholds of significance and/or mitigating the impact through multimodal transportation improvements or mitigations to enhance transportation mode shift (use of alternative transportation modes). Following completion and adoption of VMT thresholds as part of the Ventura County ISAG, this implementation program shall no longer apply.
1. “Feasible” means that this mitigation measure shall be applied to future discretionary projects under the 2040 General Plan when and to the extent it is “capable of being accomplished in a successful manner within a reasonable period of time, taking into account economic, environmental, legal, social, and technological factors” as determined by the County in the context of such future projects based on substantial evidence. This definition is consistent with the definition of “feasible” set forth in CEQA (Pub. Res. Code, § 21066.1) and the CEQA Guidelines (§ 15164). The County shall be solely responsible for making this feasibility determination in accordance with CEQA.
PFS-G Local Agency Management Program
The County shall review and update the Local Agency Management Program plan every five years consistent with the State Water Resources Control Board Onsite Wastewater Treatment Systems Policy.
PFS-H Ventura County Sewer Policy
The County shall maintain a policy regarding the requirements and exemptions related to the connection to a wastewater treatment system.
PFS-I Onsite Wastewater System for Commercial and Industrial Uses
Discretionary development for commercial or industrial facilities served by onsite wastewater treatment facilities shall be conditioned to grant an access easement to the applicable County Service Area. In addition, regular testing and monitoring of onsite wastewater treatment system shall be performed to the satisfaction of the County’s Environmental Health Division.